
The plumbing is being roughed in. The floor won't be poured until the radiant heat is put down.
We have backfill around three sides! The west side is not done yet, but all the piles of dirt have shrunk considerably.
The inside walls have all been sealed with very stinky grey stuff. Glad there's still a lot of air flowing thru there. Peew!
No comments:
Post a Comment