All the interior walls have been cross-braced to hold them in place during the house "drop". Our contractor came out on Saturday and did a little backfilling and clean-up. We walked thru the basement with him and made plans for how and where the bathroom will be roughed in, how the plumbing will be re-connected, and how the rooms will lay out. We'll end up with a storage room under the back porch that I didn't think would be accessible, which is cool. We're going from absolutely no basement storage to more than we planned on! The house movers are definitely coming on Monday to drop the house onto the new foundation. At least, that's the plan. Crossing my fingers!
Saturday, August 23, 2008
Ready To Drop
All the interior walls have been cross-braced to hold them in place during the house "drop". Our contractor came out on Saturday and did a little backfilling and clean-up. We walked thru the basement with him and made plans for how and where the bathroom will be roughed in, how the plumbing will be re-connected, and how the rooms will lay out. We'll end up with a storage room under the back porch that I didn't think would be accessible, which is cool. We're going from absolutely no basement storage to more than we planned on! The house movers are definitely coming on Monday to drop the house onto the new foundation. At least, that's the plan. Crossing my fingers!
Subscribe to:
Posts (Atom)