Saturday, August 23, 2008

Ready To Drop



All the interior walls have been cross-braced to hold them in place during the house "drop". Our contractor came out on Saturday and did a little backfilling and clean-up. We walked thru the basement with him and made plans for how and where the bathroom will be roughed in, how the plumbing will be re-connected, and how the rooms will lay out. We'll end up with a storage room under the back porch that I didn't think would be accessible, which is cool. We're going from absolutely no basement storage to more than we planned on! The house movers are definitely coming on Monday to drop the house onto the new foundation. At least, that's the plan. Crossing my fingers!

Thursday, August 21, 2008

Walls

The sill plate is on and the walls are going up. Thrilling stuff, isn't it? Not really. I'm antsy for the house to come back down. It's been 3 weeks. School starts in 2. Enough already.

Wednesday, August 20, 2008

Progress is Progress

Progress feels slow lately, but I'm learning to be patient while waiting for things to dry. The waterproofing went on today, and the lumber for the interior has arrived, so hopefully tomorrow walls will go up. The waterproofing should be called Black Goo, but as long as it works, I'll be happy.

Tuesday, August 19, 2008

Getting There

Ta Da! 12 courses high all the way around the house! These photos are from 6:30 last night, so they made a lot of progress after lunch yesterday. The walls even have a skim coat on them. Done! Now we can put the house down and move back in, right?? Well, not exactly. First, interior load-bearing walls need to be put up under parts of the house, specifically every addition made to the original house, and there are a lot of them! Every line of bricks on the floor in the second photo marks an addition to the original 1870 house, which may have been moved from across the road by E.P. Ring himself. No, it isn't a log cabin. The original farmhouse appears to have been two rooms: the dining room and the front bedroom, along with the room upstairs (this explains why the house had an extra set of stairs off the dining room, and why they were so tiny!) The room that is now the kitchen looks like it was added as a porch, and later enclosed, which would explain why it's 8 feet wide and 30 feet long. The other wing of the house was also added later, although turned out to be the center of the house, 'cuz they just kept adding!
If we use the second photo as a "map", the front porch is the first outline almost hidden by the front wall, followed by the main house, then the kitchen, and then the back porch. One more wall will run perpendicular to these, under the wall between the dining and living rooms. Of course, there's a large pile of dirt in the way, so that will have to wait. It looks like a mouse-maze of small rooms (wait, this basement is supposed to be Mouse Free!), but remember that the house is 45 feet by 30 feet, so there'll be plenty of room.
After the walls are installed, the house can come down. Then the cribbing and beams will come out.
Then all the dirt.
Then the last of the drain tile and gravel laid down.
Then the load-bearing interior wall.
Then all the "beam-holes" will need to be filled in.
Then the last wall will be put up.
Then the plumbing needs to be re-connected.
Oh, and the electricity.
Hmmm...I don't think we'll be back in the house for a while.




Monday, August 18, 2008

All The Way Around

Hooray! The walls are up all the way around, 7 courses high. Our contractor brought in extra bodies to get it done. He said the sooner the house comes back down, the better he'll sleep at night. 5 courses to go!
Isn't it pretty?


The opening for dirt removal. The egress window will go here.


The walls are 2/3 of their final height. The dirt on the right is still at the height of the original basement floor. The new back porch is straight ahead. The stairs will come down along the right side of the wall.

Thursday, August 14, 2008

Wall Progress


One wall is now 7 courses high, and more corners are up. Wet weather makes for slow progress, but some of the piles of debris are actually smaller today, so they're doing what they can. I don't think they'll be done on Friday, though, unless The Flash is on their crew.

Wednesday, August 13, 2008

The Block

The block and mortar arrived this morning. The walls are going to go up first, then the house will come back down and the rest of the dirt will be scooped out. This afternoon they had one half-wall finished. The weather has gotten cooler and rainier, although the last few storms have missed us and gone to The Cities. They can take them for the next few days, I need dry, wall-building weather! The boys are much more impressed with the mountains of dirt in the yard. I think they'll miss them when they're gone.